Solar Calculator Pakistan
Calculate system size, panel count, required roof area, battery capacity, investment costs, and 25-year financial ROI. Integrated with NEPRA net billing models and city climates.
1. Core Usage & Presets
DISCO Utility Mapping:LESCO (Lahore)
Active Sun Exposure:5.30 Hrs / day
Daytime consumption (currently set to 40%) saves you the full 35 Rs/unit. Exports receive only Rs. 11/unit buyback rate.
2. Rooftop Planning & Suitability
Spacious Fit Confirmed
Required structure space is 306 sq ft. You have 194 sq ft remaining for expansion or walking clearance.
Structure & Framing Recommendation:
Highly Suitable: Ideal for elevated L2/L3 galvanized frames. Heavy wind resistance, perfect structural safety.
3. Battery Storage Estimator
Option A: Lithium (LiFePO4)
4.3 kWh pack
Option B: Lead-Acid (Tubular)
6 Batteries (200Ah)
Rooftop Solar Feasibility Assessment Matrix
Recommended Size: 5.0 kW5.0 kW
Generates ~669 kWh/mo9 modules
550W High Purity A-Grade306 sq ft
Allowing structure spacing5.0 kW
Matching system loadRs 904,400
Fully installed, grid activeRs 13,119
Direct + Export creditsRs 157,427
Utility offset projection5.7 Years
Amortization thresholdEcological Impact Profile
This system reduces carbon dioxide output by 4,175 kg of CO₂ per year, equivalent to planting 190 mature trees annually, supporting Pakistan's climate action and clean energy targets.
Detailed Component Cost Assessment:
A-Grade Solar Plates: Rs 173,250
Solar Inverter Unit: Rs 257,400
Mounting, Cable & Labour: Rs 123,750
Battery Pack: Rs 325,000
Net Metering Licensing: Rs 25,000
Aggregate Outlay: Rs 904,400
Investment Payback Curve (10-Year Projections)
Graph depicts cumulative cash benefit. The intersection dot represents your breakeven threshold, beyond which solar generation is 100% net profit.
Ready to share your Solar Feasibility Report?
Export this complete calculation sheet as a professional, certified PDF document or shareable link.

Standard Assumptions & Regulatory Framework
This planning calculator calculates financial parameters based on NEPRA prosumer net billing regulations in Pakistan. In addition, calculations are adjusted based on the following engineering and structural baselines:
- AEDB Approved Components: System sizing is based on high-purity, Tier-1 monocrystalline half-cell bifacial panels (A grade) with certified product efficiencies above 21.5%.
- Structure Spacing (Wind Load Factor): Area requirements are set at 34 sq ft per panel, incorporating walking walkways and shadow spacing arrays to prevent self-shading during low-winter angles. This ensures structural safety during Punjab dust storms or Sindh wind corridors.
- Heat Degradation Loss: Standard PV module temperature coefficient decreases output by ~0.35% for every degree above 25°C. The 15% default loss factor incorporates this extreme summer temperature dip across cities like Multan, Lahore, and Karachi.
- Net Metering Slabs: Imported units are billed progressively under NEPRA domestic slabs. Self-consumption during peak sun hours completely offsets high retail rates. Exported surplus units are credited at the standard buyback index.
| Data Metric / Constant | Official Custodian Source | Sync Frequency / Update Status |
|---|---|---|
| National Net Billing Tariffs | National Electric Power Regulatory Authority (NEPRA) | Updated - February 2026 regulations |
| Solar Panel Price Benchmarks | Alternative Energy Development Board (AEDB) Vendor Surveys | Monthly market check - July 2026 |
| Regional Solar Irradiance Models | NREL Global Solar Atlas & World Bank Met database | Fixed meteorological climate models |
| Commercial Bank Financing Rules | State Bank of Pakistan (SBP) Green Finance Scheme & Commercial lenders | Semi-annual survey |
Common Installer Scams & Verification Safeguards in Pakistan
As solar demand spikes across Pakistan, many fraudulent installers target unwary residential buyers. Protect your investment using these critical checkpoints:
- The B-Grade Panel Fraud: Fraudulent dealers often scrub B-grade or cracked cells and stamp fake Tier-1 brand barcodes. Always demand flash-test reports and verify serial numbers directly on the manufacturer's website.
- Under-Sized Earthing & Grounding: Many budget installers skip dual copper earthing pits or use thin cables. Improper earthing can destroy your hybrid inverter during lightning strikes. Insist on a digital resistance check (must be under 2 ohms).
- Fake AEDB Licensing claims: Installers must hold active AEDB licenses to legally process net-metering applications. Verify their certification status on the official AEDB web portal before making a down payment.
For official rules, please refer to the NEPRA Portal or the AEDB Portal. For precise quotes and roof loading calculations, obtain three on-site vendor evaluations from certified engineers in your city.
Learn official calculations, see step-by-step Pakistani tax & utility examples, and read expert tips.
Why This Calculator Is Trustworthy
Developed by Abaid Awan using publicly available benchmarks referenced directly from official Pakistani authorities, including FBR, NEPRA, State Bank of Pakistan (SBP), and WHO guidelines.
- 100% Client-Side Calculation
- Official FY 2026–27 Formulas
- Zero Personal Data Logging
Frequently Asked Questions
How does the 2026 NEPRA Net Billing regulation affect solar savings?▼
NEPRA moved new solar accounts to net billing. While imported electricity is bought at full tariffs (Rs. 35–45/kWh), exported units earn around Rs. 10–11/kWh. Self-consuming solar power in daytime is now far more lucrative than exporting.
How many panels do I need for standard system sizes like 5kW and 10kW?▼
Using 550W panels: a 3 kW needs 6 panels, a 5 kW needs 9 panels, an 8 kW needs 15 panels, and a 10 kW needs 18 panels. Area requirement is about 34 sq ft per panel including spacing.
What is the difference between On-Grid, Hybrid, and Off-Grid solar?▼
On-grid is cheapest but shuts off during load shedding. Hybrid utilizes batteries to keep critical appliances running during blackouts and supports net billing. Off-grid operates entirely detached from the government power grid.
How are battery backup requirements calculated?▼
Backup requirements depend on essential wattage and runtime. For basic lights, fans, and routers (~350W draw), a 5 kWh lithium battery or 4 tubular lead-acid batteries support 4–6 hours of outage seamlessly.
How long does a solar system take to pay for itself in Pakistan?▼
With current high WAPDA tariffs, payback ranges between 3.5 to 5 years. After this initial amortization, solar provides free electricity for the remaining 20+ years of panel lifetime.
Related Calculators
View All Calculators→Age Calculator Pakistan
Exact age in years, months, days
Unit Converter Complete Pakistan
Length, weight, area, volume, temp, speed + PK units
Discount Calculator Pakistan
Sale price, savings, GST 18%
CNIC Information Checker Pakistan
Format validator & info, NADRA 13-digit
Salary Tax Calculator Pakistan 2026-27 & 2025-26
FBR salaried tax slabs 2025-26 & 2026-27 with return filing
Zakat Calculator Pakistan
2.5% Nisab calculator in PKR, gold, silver